contracts
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
contracts [2023/11/23 12:41] – angel | contracts [2023/11/27 13:19] (current) – removed arnstein86 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ===== Contract Types ===== | ||
- | * You will deal with two main types of contracts: [[Recurrent contracts]] and [[One-Off contracts]]. | ||
- | * Recurrent contracts regularly bring new trains into your network, providing a stable and predictable traffic flow. This predictability allows for strategic planning and optimization of resources. | ||
- | * One-Off contracts offer unique, singular challenges and rewards, diversifying your traffic management experiences. | ||
- | |||
- | ===== Contract Preparation ===== | ||
- | |||
- | * To generate contracts, specific buildings are required: [[Conductor Offices]] for green contracts and [[Dispatcher Offices]] for red contracts. While some Conductor Offices are pre-built, constructing additional ones is essential for acquiring more contracts. | ||
- | |||
- | ==== Contract Planning and Trial Trains ==== | ||
- | |||
- | |||
- | * Each contract starts with a planning phase. During this phase, a schedule is suggested based on distances between stations and the speed limits of unlocked tracks. The reward is calculated from the scheduled travel time compared to the optimal time. Adjusting the schedule can lead to higher rewards but beware of penalties if the schedule is unrealistic. | ||
- | |||
- | * Following planning is the [[trial train]]. The trial train serves to validate the planned schedule. Based on its performance, | ||
- | |||
- | * After the trial train completes its journey, you can further adjust the schedule to better align with real-world conditions and optimize contract fulfillment. | ||
- | |||
- | ==== Optimizing Contract ==== | ||
- | |||
- | * You have the option to optimize or reject contracts as your network evolves. | ||
- | * Two key upgrades, [[Platform Adjustments]] and [[Timetable Adjustments]], | ||
- | * Carefully consider each contract before acceptance. Reviewing station timetables and planning resources is crucial to ensure your network can handle the additional traffic. | ||
- | |||
- | *Dispatcher' |
contracts.1700743291.txt.gz · Last modified: 2023/11/23 12:41 by angel